Wastewater Treatment And Disposal System Irrigation Pump Station Replacement Project

Contract Documents for the Construction of the:

WASTEWATER TREATMENT AND DISPOSAL SYSTEM IRRIGATION PUMP STATION REPLACEMENT PROJECT.

Bid Results

 

Cover Page

Table of Contents

A – Notice to Bidders

B – Information For and Instructions to Bidders

C – Qualifications

D – Bid

E – Agreement

F – General Specifications

G – Technical Specifications

H – List of Description of Drawings

Drawings

Gorman-Rupp Station Enclosure Installation Procedures

I – Permits

J – Forms

Mandatory Pre-Bid Contractor Meeting Sign-In Sheet

Addendum No. 1

Addendum No. 2

Addendum No. 3

Addendum No. 4

Addendum No. 5

Addendum No. 6

Addendum No. 7